PROJECT DESCRIPTION

FACILITY

CLIENT

Year

Dismantling and reinstallation of the facility power supply system, installation of 0.4 kV auxiliary system, electrical drives lighting, power sockets, earthing and lightning protection systems, I&C equipment and the central system for monitoring and control (for HVAC systems).Cabling and wiring. Individual and functional tests and adjustments with participation in trial operation. Detail design and as built design.

CMT-2, INTERNATIONAL TRADE CENTER
Krasnopresnejnskaja 12,
complex 2
New power-block in facility „C + E’’
Moscow

OAO INTERNATIONAL TRADE CENTER

2006 / 2007

Electrical power supply, automation system, monitoring and control system detail design for the whole complex of 8 buildings with a total area of 216,534 m².

MOSCOW CITY TECHNOPARK
NAGATINO ZIL – I phase
Avtozavodskaja 23
Moscow

OAO MOSCOW BUSINESS-INCUBATOR

2006 / 2007

Electrical power supply, automation system, monitoring and control system preliminary design for the whole complex of 3 buildings with a total area of 216,534 m².

CMT-2, INTERNATIONAL TRADE CENTER – II phase
Krasnopresnejnskaja 12,
Complex 2
Moscow

OAO INTERNATIONAL TRADE CENTER

2006

Delivery and installation of equipment for  0.4 kV auxiliary system, installation of security system AC / DC power supply, lighting, power sockets, earthing and lightning protection systems, telephony, interphone and sound systems. Installation of cable routes, cabling and wiring.

PHARMACEUTICAL FACTORY BUZANINOVO
Administrative building

OAO PROTEK

2004 / 2005

Delivery and installation of equipment for 0.4 kV auxiliary system, installing of UPS 2x160 kVA, electrical drives, lighting, power sockets, earthing and lightning protection systems, HVAC systems. Delivery and installation of cable routes, cabling and wiring. Detail design. Individual and functional tests and adjustments with participation in trial operation. The building area of 18,000 square meters.

GNK
BUSINESS CENTER
Kržinanovskog 16/3
Moscow

ZAO GAS-OIL COMPANY

2004 / 2005

Delivery and installation of equipment for 0.4 kV auxiliary system, installation of security system AC / DC power supply, electrical drives, lighting, power sockets, earthing and lightning protection systems, I&C system. Shop design and as built design. Installation of cable routes, cabling and wiring.. Individual and functional tests and commissioning.

PHARMACEUTICAL FACTORY BUZANINOVO

OAO PROTEK

2003 / 2004

Delivery and installation of 10 kV and 0.4 kV auxiliary system, installation of power transformer 1600 kVA,UPS 120 kVA + 7 x 20 kVA, electrical drives, lighting, power sockets, earthing and lightning protection systems, HVAC systems. Delivery and installation of cable routes, cabling and wiring. Individual and functional tests and adjustments with participation in trial operation. As-built design. The building area of 55,000 square meters.

CMT-2,
INTERNATIONAL TRADE CENTER
Krasnopresnejnskaja 12
Moscow

OAO International Trade Center

2002 / 2003

Supply and installation of 6 kV and 0.4 kV auxiliary system, installation of security system AC/DC power supplies, electrical drives, lighting, power sockets and earthing systems, telephony, sound systems, signaling and fire protection. Installation of cable routes, cabling and wiring. Individual and functional tests and adjustments with participation in trial operation.

GAS AND COMPRESSOR STATIONS
GORNJOZAVODSK
5 X 15 MW

Delivery and installation of 6 kV and 0.4 kV auxiliary system, installation of security system AC/DC power supplies, electrical drives, lighting, power sockets and earthing systems, telephony, sound systems, signaling and fire protection and I&C equipment. Installation of cable routes, cabling and wiring. Individual and functional tests and adjustments with participation in trial operation.

SHAMPOO FACTORY
Vladivostok

Installation of I&C equipment. Installation of cable routes, cabling and wiring. Individual and functional tests and adjustments with participation in trial operation.

COMPLEX LAB I LABS
Kirishi

Delivery and installation of 10 kV switchgear in SS 2x1000 kVA, 10/0.4 kV, installation of oil transformers, installation of street lighting. Temporary electrical installations for site power supply.

THEATER NEW OPERA
Moscow

Delivery and installation of 0.4 kV auxiliary system, UPS 2 x 60 kVA, lighting, power sockets, earthing and lightning protection installations, telephony, interphone, video surveillance and intrusion protection. Delivery and installation of cable routes, cabling and wiring. Individual and functional tests and adjustments with participation in trial operation.. Building area of 3,000 m².

SBS BANK
Sankt-Petersburg

Delivery and installation of 6 kV and 0.4 kV auxiliary system, electrical drives, security system AC/DC power supply, lighting, power sockets, earthing and lightning protection systems, telephony, interphone,fire protection, video surveillance and intrusion protection HVAC systems and water works. Delivery and installation of cable routes, cabling and wiring. Shop design. Individual and functional tests and adjustments with participation in trial operation. The building area of 20,000 square meters.

,,SVERDLOVSKA GUBERNI BANK’’
Jekaterinburg

Delivery and installation of equipment and installation of 0.4 kV auxiliary system, installation of lighting, power sockets, earthing and lightning protection systems. Delivery and installation of cable routes, cabling and wiring. Shop design and as built design. Individual and functional tests and adjustments with participation in trial operation. The building area of 15,000 square meters.

GUTA BANK
Moscow