Supply of goods with the disassembly-assembly work and production of technical documentation for the new DCS control system at Unit B2 TPP Nikola Tesla Obrenovac. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2016 |
Backup power for electrostatic precipitators in TENT-A (A3-A6); supply and installation of 6 kV and 0.4 kV equipment, including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2016 |
Reconstruction of electrostatic precipitators of Unit TPP MORAVA; supply and installation of 6 kV and 0.4 kV equipment, installations of transformers, rectifiers and I&C equipment, including testing and commissioning. |
TPP MORAVA, |
Electric Power
|
2016 |
Reconstruction of electrostatic precipitators of Unit A3; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2014 |
Reconstruction of Unit B1, 670MW; delivery and installation of 6 kV and 0.4 kV switchgear, I&C equipment, including testing and commissioning. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2012 |
Reconstruction of electrostatic precipitators of Unit B2; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP KOSTOLAC-B , |
Electric Power
|
2012 |
Reconstruction of electrostatic precipitators of Unit B2; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2011 |
Reconstruction of Unit B2, 350MW; installation of 6 kV and 0.4 kV switchgear including testing and commissioning. |
TPP KOSTOLAC-B , |
Electric Power
|
2010/2012 |
Reconstruction of 110 kV switchgear; delivery of equipment, installation, including testing and commissioning. |
TPP KOLUBARA-A , |
Electric Power
|
2010/2011 |
Reconstruction of Unit B2, 350MW; delivery of I&C equipment, installation, including testing and commissioning. |
TPP KOSTOLAC-B , |
Electric Power
|
2010 |
Reconstruction of electrostatic precipitators of Unit A6; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2010 |
Reconstruction of ash and slag disposal system; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2009 |
Reconstruction of fire&gas detection system; delivery of equipment, installation, including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2009/2010 |
Reconstruction of ash and slag disposal system; installation of 6 kV and 0.4 kV equipment and installation, including testing and commissioning. |
TPP KOLUBARA-A , |
Electric Power
|
2009 |
Reconstruction & modernization of Unit A6, 348MW; installation of 6 kV and 0.4 kV switchgear, I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2008/2010 |
Fire protection of slanted bridges for coal feeders/conveyers; delivery of equipment, installation, testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2008/2010 |
Reconstruction of ash and slag disposal system; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOSTOLAC-B , |
Electric Power
|
2008/2009 |
Reconstruction of Unit B1, 350MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOSTOLAC-B , |
Electric Power
|
2008 |
Reconstruction of electrostatic precipitators of Unit A5; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP KOLUBARA-A , |
Electric Power
|
2008 |
Reconstruction of Unit A4, 308MW; delivery and installation of 6 kV and 0.4 kV switchgear, I&C equipment, including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2007 |
Reconstruction of Unit A2, 210MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOSTOLAC-A , |
Electric Power
|
2007 |
Reconstruction of Boiler K2; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOSTOLAC-A , |
Electric Power
|
2007 |
Reconstruction of electrostatic precipitators of Unit A1; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP KOSTOLAC-A , |
Electric Power
|
2007 |
Reconstruction of electrostatic precipitators of Unit A4; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2007 |
Reconstruction of Unit A1, 210MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2006 |
Reconstruction of electrostatic precipitators of Unit A1; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2006 |
Reconstruction of electrostatic precipitators of Unit A2; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP KOSTOLAC-A , |
Electric Power
|
2006 |
Reconstruction of Boiler K1; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOSTOLAC-A , |
Electric Power
|
2005/2006 |
Reconstruction of Unit A2, 210MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2005 |
Reconstruction of electrostatic precipitators of Unit A2; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2005 |
Reconstruction of electrostatic precipitators of Unit A5; installation of 6 kV and 0.4 kV equipment and installations, transformers, rectifiers and I&C equipment including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2004 |
Reconstruction of Unit 125MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP Morava, |
Electric Power
|
2004 |
Reconstruction of Unit A3, 308MW; delivery and installation of 6 kV and 0.4 kV switchgear, I&C equipment, including testing and commissioning. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2002/2003 |
Reconstruction of Boiler K2 in auxilary boiler room; design, delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2002 |
Reconstruction of Unit A5 110MW; delivery and installation of 6 kV and 0.4 kV equipment and installations, transformers, inverter system, insulated busbar system, cables and cable routes, including testing and commissioning. |
TPP KOLUBARA-A, |
Electric Power
|
2002 |
Reconstruction of Unit A5 110MW; delivery of electrical and I&C equipment, installation, testing and commissioning. |
TPP KOLUBARA-A, |
Electric Power
|
2002 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives, Units A1, A2, A3, A4, A5, A6. |
TPP NIKOLA TESLA-A, |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, lighting and motor drives, Units B1, B2. |
TPP NIKOLA TESLA-B, |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives, Units A1, A2. |
TPP KOSTOLAC-A , |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives, Units B1, B2. |
TPP KOSTOLAC-B , |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives, Units A1, A2, A3, A4, A5. |
TPP KOLUBARA-A, |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives. |
TPP MORAVA , |
Electric Power
|
2000-2014 |
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives. |
TPP PLJEVLJA, |
Electric Power Industry of Montenegro |
2002-2008 |
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation , 6/0,4 kV/kV), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units A1, A2, A3, A4, A5, A6. |
TPP NIKOLA TESLA-A, |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units B1, B2. |
TPP NIKOLA TESLA-B, |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units A1, A2. |
TPP KOSTOLAC-A, |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units B1, B2. |
TPP KOSTOLAC-B , |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units A1, A2, A3, A4, A5. |
TPP KOLUBARA-A |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations including functional testing and commissioning. |
TPP MORAVA, |
Electric Power
|
|
Installation of I&C equipment including functional testing and commissioning. |
TPP PLJEVLJA, |
Electric Power
|
|
Installation of 6 kV and 0.4 kV equipment and installations, diesel generator and DC battery units. Cable routes, 0.4 kV and 6 kV cabling and wiring. |
TPP UGLJEVIK, |
Electric Power
|
|
Annual maintenance of motor drives and I&C equipment |
TPP GACKO, |
Electric Power
|
|
Annual maintenance, overhaul of switchgear, I&C system, lighting and motor drives including testing, Units A1, A2, A3 i A4. |
TPP KOSOVO-A, |
|
|
Installation of I&C equipment including functional testing and commissioning. |
TPP KOSOVO-B, |
|
|
Annual maintenance, overhaul of switchgear, I&C system, lighting, grounding and motor drives, Units B1 and B2. |
TPP KOSOVO-B, |
|
|
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, insulated busbars, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning, Units 1, 2, 3, 4. |
TPP TUZLA, |
||
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, motor drives, lighting, grounding, fire alarm system, telephone and I&C system including functional testing and commissioning. |
TPP DAURA, |
||
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, motor drives, lighting, grounding, I&C system, cable routes, cabling and wiring including functional testing and commissioning. |
TPP-TO NOVI SAD, |
||
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, motor drives, lighting, grounding, I&C system, cable routes, cabling and wiring including functional testing and commissioning. |
TPP-TO NOVI BEOGRAD, |
NATURAL GAS COMPRESSOR STATIONS
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Installation of 6 kV and 0.4 kV equipment and installations for self-consumption, emergency AC/DC supply, motor drives, lighting, small power, grounding, telephony, sound system, fire alarm and I&C system. Cable routes, cabling and wiring including functional testing and commissioning. |
NATURAL GAS COMPRESSOR STATIONS, |
GORNJOZAVODSK, |
|
HYDRO POWER PLANTS
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Installation of 6 kV and 0.4 kV equipment and installations, installation of transformers (main unit power transformers, station service power transformers, unit auxiliary power transformers, excitation transformers, 6/0,4 kV/kV transformers), static excitation, generator switches, motor drives, lighting, grounding, I&C system, cable routes, cabling and wiring including functional testing and commissioning. |
HPP ĐERDAP II, |
|
|
Installation of busbars, CBs, disconnectors, VTs, CTs, equipment and installations for transformer fire protection. Excitement system replacement. Reconstruction of supply, cables, surge arresters, lighting and grounding. Signaling/measurment cable installation. Functional testing and commissioning. |
HPP ZVORNIK, |
|
|