Switchgears And Substations
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Replacement and relocation outside the Ex zone 0.4 kV MCC in block 5; Delivery of equipment for the replacement of 0.4 kV facilities reconnecting with old customers, buildings construction, cable trays construction, cables laying and termination, expansion of the system to acquire and display data, and functional testing with commissioning. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2016 |
Replacement of 6kV switchgears BA and BB in 35/6kV, cable trays construction, cables laying and termination and functional testing with commissioning. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2016 |
Replacing low-voltage switchgear in the substation N1 6kV/0.4kV; Delivery of equipment for replacement of 0.4 kV cubicles with reconnecting with old customers, installation of cable routes, cabling and wiring, delivery of SCADA system, individual and functional testing with commissioning and start up. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2014 |
Additional cubicles of switching blocks within the installation for construction of line for condensate polishing. Expanding the switch block MCC3 0.4 kV and reconstruction of the plant CA 0.4 kV in SS Enegrana 6kV/0.4kV, in the context of the construction of line for condensate polishing. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2014 |
Reconstruction of 0.4 kV cubicles in SS N1 6kV/0.4kV, within the project of closed drainage system in block 5 and block 6. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2014 |
Connection of 6kV power supply of the existing SS "35/6kV" from the new SS 220/6/6kV; Delivery and installation of medium-voltage and low-voltage equipment with the delivery and installation of 6 kV busbar system, installation of cable routes, cabling and wiring, extension of the SCADA system, testing and commissioning. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2013 / 2014 |
Switchgear cubicle with frequency converters in SS N1 6kV/0.4kV and 0.4kV substation at Block 6, for power supply of electrical drives in air coolers S2100 and S2200. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2013 / 2014 |
Reconstruction of 6 kV auxiliary system switchgear. |
TE MORAVA, Svilajnac |
JP EPS PD TENT |
2013 |
Electrical installation works on the replacement of 6kV/0.4kV power transformer and 0.4kV switchgear in SS "D". |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2013 |
Procurement, delivery and installation of fault locator at Ranney wells. |
Belgrade Waterworks and Sewerage |
PUC Belgrade Waterworks and Sewerage |
2013 |
Testing and revision of 10 kV facility in SS 110/10 kV in Makiš Plant. |
Makiš Plant |
PUC Belgrade Waterworks and Sewerage |
2013 |
Procurement, delivery and installation of 10kV equipment in the bay No.6 in SS 110/10kV Makiš. |
Makiš Plant |
PUC Belgrade Waterworks and Sewerage |
2012 |
Installation, testing and commissioning of SS 220/6kV-N and SS 2201 6/0.4kV, within the Project Electrical and I&C installation at the MHC/DHT Plant (ISBL part). |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2012 |
Installation, testing and commissioning SS 501 6/0.4 kV, SS 16701 6/0.4 kV and SS 91501 6/0.4 kV, within the project - Electrical and I&C installation at the MHC/DHT Plant (OSBL part). |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2012 |
Replacement of power transformers 6/0,4 kV, installation of 0.4 kV switchgear "MCC IV E" |
SS HDPE 6/0,4 kV, |
HIP PETROHEMIJA |
2012 |
Reconstruction of the 110 kV switchyard in heating plant Novi Beograd. |
HEATING PLANT |
PUC Belgrade Power Plants, Belgrade |
2011 |
Reconstruction of 110 kV switchyard in thermal power plant Kolubara A, Veliki Crljeni. |
TE KOLUBARA A |
PU EPS PD TENT Obrenovac |
2010 |
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers and other equipment. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2010 |
Replacement of 0.4 kV switchgear with a new switcgear in SS 6 /0.4kV "N2"; Delivery and installation of electrical power equipment and materials, electrical installations with testing and commissioning. |
OIL REFINERY PANČEVO |
NIS A.D.,
|
2005 |
Detail design and installation works for the adaptation of 110 kV switchyard. Power transformers and relay protection testing. |
SS 110/6 kV, TITAN, CEMENT FACTORY |
SS 110/6 kV, TITAN, CEMENT FACTORY |
2005 |
Installation of 10 kV bays, busbars, circuit breakers, disconnectors, current and voltage measuring transformers and equipment. Individual and functional tests and adjustments with participation in trial operation. |
SB 10 kV SS 10/0,4 kV 3X (2 X 1 600) kVA |
Chamber of Commerce of Russia and the International Trade Centre |
2003 |
Measurement, protection and control systems and equipment installation. Individual and functional tests and adjustments with participation in trial operation. |
SS 10/0,4 kV |
Chamber of Commerce of Russia and the International Trade Centre |
2003 |
Installation of busbars, circuit breakers, disconnectors, HV and LV insulators, OHL reactors, current and voltage measuring transformers, power transformer fire protection system, cable routing, surge arresters, lighting and earthing. Measurement, protection and control systems installations. Installation of measuring and signaling cables.Individual and functional tests and adjustments with participation in trial operation. |
SY IN SS 400/220/35 kV OHL 220 kV SY-TPP FOR TPP
|
||
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers, equipment. Individual and functional tests and adjustments, and commissioning. |
SY 110/35 kV FOR HPP ZVORNIK |
||
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers, equipment. Individual and functional tests and adjustments with participation in trial operation. |
SS 33/11/6 kV |
||
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers, equipment. Individual and functional tests and adjustments with participation in trial operation. |
SS 33/11 kV |
||
Installation of 10kV switchgear, busbars, circuit breakers, disconnectors, current and voltage measuring transformers and equipment. |
SG 10 kV |
||
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers.Individual and functional tests and adjustments and participation in trial operation. |
SS 35/10/0,4 kV |
||
Installation of busbars, circuit breakers, disconnectors, current and voltage measuring transformers, power transformer fire protection system, cable routing, surge arresters, lighting and earthing. Installation of control system, remote monitoring and equipment for HF connection. Measurement, protection and control system installation. Installation of measuring and signaling cables. Individual and functional tests and adjustments with participation in trial operation. |
SS 10/0,4 kV |