INDUSTRIAL FACILITIES
CELLULOSE, VISCOSE AND PAPER FACTORIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Installation of 0.4 kV equipment, power transformers, electrical drives and lighting installation. Installation of cable routes, laying and connecting cables. Testing and commissioning. |
PAPER FACTORY |
PAPER FACTORY |
2002 |
Installation of 6 kV and 0.4 kV equipment, power transformers, electrical drives, lighting equipment and I&C equipment. Installation of cable routes, laying and connecting cables. Testing and commissioning. Reconstruction of boiler I&C equipment. |
INCEL |
INCEL |
|
Installation of I&C equipment and systems for process protection. Installation of cable routes, laying and connecting cables. Testing and commissioning. |
PAPER FACTORY MATROZ |
PAPER FACTORY MATROZ |
|
CEMENT AND LIME FACTORIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Project design and application software delivery for petroleum coal mill plant. Delivery of detail design and installation works for adaptation of 110 kV and 0.4 kV facilities. Reactive power compensation. Testing and adjustments of protection devices. Testing and commissioning of electrical and I&C equipment at the mill for grinding coal. |
TITAN |
TITAN |
2004/2005 |
0.4 kV equipment installation, electrical drives, lighting equipment and I&C equipment installation. Installation of cable routes, laying and connecting cables. Individual and functional tests and commissioning. |
CEMENT FACTORY |
CEMENT FACTORY |
|
PHARMACEUTICAL FACTORIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Equipment delivery and installation of 0.4 kV auxiliary system, security system AC/DC power supplies, electrical drives, lighting systems, power sockets, earthing, lightning and I&C equipment. Installation of cable routes, laying and connecting LV (0.4 kV) and command signal cables. Individual and functional tests and commissioning. |
PHARMACEUTICAL FACTORY |
OAO PROTEK
|
2004/2005 |
CAR FACTORIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
6 kV and 0.4 kV auxiliary system facility installation, security system AC/DC power supplies, electrical drives, lighting, earthing and lightning protection systems, telephony, intercom, sound system, signaling and fire protection installation. Cable routes installation, laying and connecting cables. Testing and commissioning. |
DAIMLER-BENZ AG |
|
|
0.4 kV auxiliary system equipment installation, security system AC/DC power supplies, electrical drives, lighting, power sockets and earthing, telephony, intercom, sound systems, video surveillance, alarm and fire protection and I&C equipment installation. Cable routes installation, laying and connecting cables. Testing and commissioning. |
BMW |
|
|
GAS AND COMPRESSOR STATIONS
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
6 kV and 0.4 kV auxiliary system installation, security system AC/ DC power supplies, electrical drives, lighting, power sockets and earthning, telephony, sound systems, signaling and fire protection and I&C equipment installation. Cable routes installation, laying and connecting cables. Testing and commissioning. |
GAS AND COMPRESSOR
|
GORNJOZAVODSK |
ENERGY AND HEATING PLANTS
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
I&C equipment and system installation, installation of lighting, earthing, lightning, telephony and fire protection systems. Individual and functional tests and commissioning. |
|
NIS A.D. Novi Sad, Serbia |
2002 |
I&C equipment and system installation, installation of lighting, earthing, lightning, telephony and fire protection systems. Individual and functional tests and commissioning. |
ENERGY PLANT
VISKOZA Loznica,Serbia |
OIL FACTORIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
6 and 0.4 kV auxiliary system equipment installation, installation of security system AC/DC power supplies, transformers, electrical drives, lighting,power sockets, earthing and lightning protection systems, telephony, intercom, sound system, signaling and fire protection and I&C equipment. Cable routes installation, laying and connecting cables. Testing and commissioning. Reconstruction of the boiler room and process part of pressing and extraction facility, including design, delivery and installation of equipment and commissioning. |
OIL FACTORY |
OIL FACTORY |
|
6 and 0.4 kV auxiliary system equipment installation, installation of security system AC/DC power supplies, transformers, electrical drives, lighting, power sockets, earthing and lightning protection systems and I&C equipment. Cable routes installation, laying and connecting cables. |
ULJARICA
|
ULJARICA
|
FROZEN FOOD FACTORY
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
6 and 0.4 kV auxiliary system equipment installation, installation of security system AC/DC power supplies, electrical drives, lighting, power sockets, earthing and lightning protection systems and I&C equipment. Cable routes installation, laying and connecting cables. |
FRIKOM
|
FRIKOM
|
DRINKIG WATER PLANTS
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Testing and reconstruction of 10 kV facility in SS 110/10 kV in Makiš Plant. |
BELGRADE WATER SUPPLY AND SEWERAGE |
BELGRADE WATER SUPPLY AND SEWERAGE |
2013 |
Procurement, delivery and installation of fault locator at Ranney wells. |
BELGRADE WATER SUPPLY AND SEWERAGE |
BELGRADE WATER SUPPLY AND SEWERAGE |
2013 |
Procurement, delivery and installation of 10kV equipment for SS bay no. 6 in SS 110/10kV Makiš. |
BELGRADE WATER SUPPLY AND SEWERAGE |
BELGRADE WATER SUPPLY AND SEWERAGE |
2012 |