OIL REFINERIES, PETROCHEMICAL AND BASIC CHEMICALS INDUSTRY
OIL REFINERIES
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
Replacement and relocation outside the Ex zone 0.4 kV MCC in block 5; Delivery of equipment for the replacement of 0.4 kV facilities reconnecting with old customers, buildings construction, cable trays construction, cables laying and termination, expansion of the system to acquire and display data, and functional testing with commissioning. |
NIS A.D., |
NIS A.D.
|
2016 |
Replacement of 6kV switchgears BA and BB in 35/6kV, cable trays construction, cables laying and termination and functional testing with commissioning. |
NIS A.D., |
NIS A.D.
|
2016 |
Blending biocomponents with diesel fuel in Oil Refinery Pancevo, Phase II in NIS ad Novi Sad, Block "Processing"; Performing electrical and instrumentation installation works with delivery of equipment and materials, testing and commissioning, Installation of gas and fire detection system (FGS). |
NIS A.D., |
NIS A.D.
|
2015 |
Closed drainage system in Block 5 and Block 6 in Oil Refinery Pancevo NIS A.D. Novi Sad, Block "Processing"; Delivery, installation, testing and commissioning of electrical power and I&C equipment. |
NIS A.D., |
NIS A.D.
|
2014/2015 |
Reconstruction of the automatic drop system on the exhaust duct BF-2201 and connection to the control system-Installation and delivery of equipment to NIS A.D. Novi Sad, Block "Processing", Pancevo Oil Refinery, with testing, commissioning and start up. |
NIS A.D., |
NIS A.D.
|
2014 |
Installation of frequency inverters on cooling tower EF-9132 fans at Oil Refinery Pancevo in NIS ad Novi Sad, Block "Energy"; Delivery, installation, testing and commissioning of electrical power and I&C equipment. |
NIS A.D., |
NIS A.D.
|
2014 |
Construction of new lines for demineralization in Block IX of Oil Refinery Pancevo, NIS A.D. Novi Sad, Block "Processing"; Perform electrical and instrumentation installation works with delivery of equipment and materials, testing and commissioning, gas and fire detection system (FGS), video surveillance and access control systems installation.OVDE |
NIS A.D., |
NIS A.D.
|
2014 |
Connect 6kV power supply of existing SS "35/6" from new SS 220/6/6 kV (Module 1); Delivery and installation of medium-voltage and low-voltage equipment with the delivery and installation of 6 kV bus system, installation of cable routes, cabling and wiring, testing and commissioning. |
NIS A.D., |
NIS A.D.
|
2013/2014 |
Replacing low-voltage switchgear in the substation N1 (Module 2); Delivery of equipment for replacement of 0.4 kV facility with reconnecting to old customers, installation of cable routes, cabling and wiring, individual and functional testing and start up. |
NIS A.D., |
NIS A.D.
|
2013/2014 |
Construction of line for condensate polishing in Pancevo Oil Refinery NIS ad Novi Sad, Block "Processing"; Delivery, installation, testing and commissioning of electrical power and I&C equipment, fire and gas detection system (FGS), video surveillance and access control.&&& |
NIS A.D., |
NIS A.D.
|
2013/2014 |
Erection of reservoirs for polymer bitumen; Procurement of equipment and materials, electro-instrumental installation works, individual and functional testing with commissioning, installation of fire and gas detection system (FGS).&&& |
NIS A.D., |
NIS A.D.
|
2014 |
Installation of frequency converters and replacement of electric motors in air coolers S-2100 and S-2200; Detail design, procurement of equipment and materials, electro-instrumental installation works, individual and functional testing with commissioning.&&& |
NIS A.D., |
NIS A.D.
|
2013/2014 |
Replacing the general reflector lighting and street lighting with energy efficient lighting equipment in Pancevo Oil Refinery; Concept design with techno- economic study for the facility lighting, recording existing conditions, As built design, design supervision, procurement of equipment and materials and Installation works.&&& |
NIS A.D., |
NIS A.D.
|
2013 |
Blending biocomponents with diesel fuel in Oil Refinery Pancevo Phase I in NIS AD Novi Sad, Block "Processing"; Detail design, Procurement of equipment and materials, Electro-instrumental installation works, individual and functional testing with commissioning.&&& |
NIS A.D., |
NIS A.D.
|
2013 |
Pancevo Oil Refinery Modernization Project Construction of the MHC / DHT (Mild Hydrocracking and Distillate Hydrotreating Complex) -ISBL; Electrical and I&C installation works with procurement of material, testing, commissioning, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011/2012 |
Pancevo Oil Refinery Modernization Project Construction of the MHC / DHT (Mild Hydrocracking and Distillate Hydrotreating Complex) -OSBL; Electrical and I&C installation works with procurement of material, testing, commissioning, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011/2012 |
Pancevo Oil Refinery Modernization Project Construction of the MHC / DHT (Mild Hydrocracking and Distillate Hydrotreating Complex); Fire and gas detection system installation, telecommunications system and video surveillance system installation with the delivery of materials, testing, commissioning, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011/2012 |
Pancevo Oil Refinery Modernization Project Construction of the MHC / DHT (Mild Hydrocracking and Distillate Hydrotreating Complex); Relocation of underground cable routes, with delivery and installation of fiber optic cables and materials.&&& |
NIS A.D., |
NIS A.D.
|
2011/2012 |
Reconstruction of the S-500 (Gas Concentration unit GCU); Electrical and I&C installation works with procurement of material, testing, commissioning, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011/2012 |
Reconstruction of SARU (Spent Acid Recovery Unit); Electrical and I&C installation works with procurement of material, testing, commissioning, start up, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011 |
Reconstruction of facility for chemical water treatment (HPV); Electrical and I&C installation works with procurement of material, testing, commissioning, integration in to the system and start up, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011 |
Reconstruction of FCC (Fluid Catalytic Cracking); Delivery of materials, electrical and I&C installation works,individual and functional testing, start up, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2011 |
Reconstruction of HPV rendering plants for sludge treatment; Electrical and I&C installation works with delivery of material, testing, start up, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2010 |
Reconstruction of FCC (Fluid Catalytic Cracking) phase I; Delivery of materials and electrical and I&C installation works,individual and functional testing, start up, As built design.&&& |
NIS A.D., |
NIS A.D.
|
2010 |
Implementation of the ON LINE BLENDING system (Computer Control Blending) in Oil Refinery Pancevo; Electrical installation works with delivery of materials, testing, start up.&&& |
NIS A.D., |
NIS A.D.
|
2007/2009 |
Relocation of the pump station; Detail deisgn and Electrical installation works.&&& |
Oil Refinery AD |
Oil Refinery AD |
2009 |
Detection of cable routes and detail design of 0.4 kV cables relocation.&&& |
Oil Refinery AD |
Oil Refinery AD |
2009 |
Works for reconstruction of power facilities and I&C equipment.&&& |
Oil Refinery AD |
Oil Refinery AD |
2008 |
Replacement 0,4kV cubicles with the new (Schneider) cubicles in SS 6/0.4kV "N2"; Delivery and installation of electrical power equipment and materials, electrical assembly works with testing and commissioning.&&& |
NIS A.D., |
NIS A.D.
|
2005 |
Installation works on implementation of electrical heaters in the benzole P line facility; Installation of I&C cabling and wiring of heating cables , testing and start up.&&& |
NIS A.D., |
NIS A.D.
|
2005 |
0,4kV relay protection testing in SS ,,N1’’, ,,N2’’, ,,C’’, ,,Energana’’ and ,,E’’.&&& |
NIS A.D., |
NIS A.D.
|
2004/2005 |
Installation of I&C system and equipment, lighting, earthing, lightning, telephony, fire protection and testing and commissioning in power plant.Individual and functional tests and commissioning.&&& |
NIS A.D., |
NIS A.D.
|
2002 |
I&C equipment and system installation (Foxboro I / A), at Sulfolane facility in Oil Refinery Pancevo.&&& |
NIS A.D., |
NIS A.D.
|
2000 |
Installation of 6kV and 0,4kV equipment, electrical drives, lighting, and earthning at the Sulfolane facility in Oil Refinery Pancevo.&&& |
NIS A.D., |
NIS A.D.
|
2000 |
Installation of 6kV and 0,4kV equipment, electrical drives, lighting,earthing, uninterruptible power supply systems, fire detection systems and telephony, I&C equipment. Installation of cable routes, cabling and wiring. Individual and functional testing with adjustments and commissioning. |
NIS A.D., |
NIS A.D.
|
|
Electrical installation works for maintenance of electrical power equipment, I&C equipment, telecommunications systems on annual basis. |
NIS A.D., |
NIS A.D.
|
|
Installation of I&C equipment and installations; installation of cable routes, cabling and wiring, individual and functional testing and commissioning. |
OIL REFINERY |
OIL REFINERY |
|
Construction of HV substation 35 kV, 10 kV, 0.4 kV, Power transformers 35/10 kV and 10/04 kV and OHL 35 kV, 0.4 kV equipment, electrical drives, lighting installation, earthing and uninterruptible power supply systems, diesel generators, AKU batteries, inverters, I&C equipment; Installation of cable routes, cabling and wiring, individual and functional testing and commissioning. |
NORTH OIL COMPANY
KHABAZ OIL FIELD DEVELOPMENT
|
NORTH OIL COMPANY
KHABAZ OIL FIELD DEVELOPMENT
|
PETROCHEMICAL AND BASIC CHEMICALS INDUSTRY
PROJECT DESCRIPTION |
FACILITY |
CLIENT |
YEAR |
0.4 kV and I&C equipment and system installation. Installation of cable routes, cabling and wiring. IT network inastallation in the new building. Electrical works on the reconstruction of PF section at HDPE plant. Individual and functional tests and commissioning. |
PETROCHEMICAL PLANT
|
||
Montaža opreme i instalacija 6 kV i 0,4 kV, elektromotornih pogona, instalacija rasvete, uzemljenja, sistema za besprekidno napajanje i I&C opreme. Izrada kablovskih trasa, polaganje i povezivanje kablova. Pojedinačna i funkcionalna ispitivanja i puštanje u rad. |
HI PANČEVO
|
||
6 kV and 0.4 kV equpment and system installation, installation of electrical drives, lighting, earthing, uninterruptible power supply systems and I&C equipment. Installation of cable routes, cabling and wiring. Individual and functional tests and commissioning. |
CI PANCEVO
LDPE, HDPE, PVC, VCM
|
||
6 kV and 0.4 kV auxiliary system equipment installation, installation of security system AC/DC power supplies, electrical drives, lighting, earthing, I&C equipment, telephony, sound systems, signaling and fire protection. Installation of cable routes, cabling and wiring. Individual and functional tests, adjustments and participation in trial operation. |
SHAMPOO FACTORY, |
||
Installation of I & C equipment, telephony, sound systems, signaling and fire protection. Production of cable routes, laying and connecting cables. Individual and functional tests, adjustments and participation in trial operation. |
LAB I LABS COMPLEX, |